Coal Reserves are the world’s most significant Fossil Fuel resource. Coal is essential for core sector like power plant, Iron & Steel, Fertilizers & Cement. MCBIPL is pioneer in Coal Handling agent in Central India from last 20 years. MCBIPL has been the player in area of coal washing and trading in the state of Chhattisgarh. Company procures coal from Coal India Limited and its subsidiary through E-Auction.

We are consistently performing in providing services to Cement Plant, Sponge Iron, Ispat, Power Plant & various small units located in Chhattisgarh, Gujarat, Rajasthan, Orissa & various other states. MCBIPL is lead in Coal Beneficiation and Coal washery having Registered office in Bilaspur Chhattisgarh. We also have our services available in Manendragarh, Gevra, Dipika & Raigarh to deal with various SECL offices in the respective areas. Our plant is located in Sirgitti area in Bilaspur Chhattisgarh. We are having Coal Washery Plant (Registered with SECL for washing of linkage coal) with a capacity of 1.20 MMT per annum. We deal with cleaning of coal and separating the coal from extrageneous materials and also process like mixing/blending where the effective constitute of fixed carbon is enhanced, thereby improving the usefulness of coal. We are having our own Railway Siding inside our coal washery with weighment facility at our own weigh bridge under the supervision of Railway Staff and Infrastructure for loading of full rake within stipulated period of time.

We, “Maheshwari Coal Benefication & Infrastructure Pvt. Ltd” are pleased to inform you that we have been successfully completed our mega-infrastructure project in Chhattisgarh State. This includes following facilities for mobilization of coal movement.

1. A coal washery with capacity of 1.20 MMT Per annum.
2. We are having eight separate coal storage yard with capacity of total five lacs MT Coal. In this capacity we can serve at a time 8 to 10 consumers.
3. Stock Yard of 50 acres having a regulated coal stock cycle of about 5 lacs MT coal.
4. Own Railway Siding inside our Plant with loading capacity of one full rake with weighment facility.
5. Having Capacity to supply coal rake to any Railway Siding within 48 hours.

It provides all coal services at a single window from securing linkage of coal (from Ministry of Coal and Coal India Limited) up to delivery of coal i.e. allotment of coal, procurement of coal directly from mines, quality and quantity control, transportation, washing and delivery at the plant of the consumer. We have permitted 24 hrs loading facility of raw coal by road by SECL of Linkage consumers.

 
 
Powered by SynQues               Copyright © 2011 - www.mcbipl.com All Rights Reserved                    Disclaimer | Privacy Policy | Site Map